Pre-Shipment Inspection Checklist: 10 Checks to Run Before the Container Leaves the Factory

The sixty-second version: a pre-shipment inspection (PSI) is the buyer's last chance to see the slate before the container is sealed. Run the checks in this order — crate count, batch number, size and thickness, colour and surface, ring test, damp packing, breakage, loading, seal, and documents — and what is inside the crates is verified against what is on the invoice. Do it as a full audit before loading, or as a spot check while the forklift is working. Where the buyer cannot attend in person, a third-party inspector runs the same checklist; fees vary by provider and scope, and for most loads they are small relative to the value of the container.

Part of the Roofing Slate Guide's Buying & Importing section — the factory-side counterpart to the receiving checklist you run when the container arrives. The breakage allowance article explains what the contract protects; this one explains how to check the goods before the container is sealed.

A pre-shipment inspection is a documented check of the finished goods at the supplier's factory, done before the container is loaded and sealed. For a roofing slate buyer it answers one question inside a short window: is what is in the crates what was ordered, tested and invoiced — while there is still time to fix it? Once the container is sealed and delivered to the port, most problems stop being correctable and become claims.

What follows is a complete roofing slate pre-shipment inspection checklist in loading-day order — crate count, batch number, dimensions, colour, soundness, damp packing, breakage, loading, seal and documents — because each check is cheaper to correct than the one after it. The sequence can be run by the buyer in person, by the supplier's own QC under a documented procedure, or by a third-party inspection company. The checklist is the same in all three cases, and so is the evidence it should produce.

Check 1 — The Crate Count, Before a Forklift Moves Anything

The count starts with the packing list, not with the crates. If the packing list says 21 crates, the yard should hold 21 — counted by walking the rows rather than trusting the tally sheet, with a photograph of each row so the buyer can verify the count from the photos alone.

It comes first because a crate count cannot be redone once the forklift starts loading: sealed into the container, the crates are beyond counting until the door opens at destination. A five-minute count that cannot be undone is also the check that catches the quietest shortfall in this trade — a crate that "fell off the truck" when production ran short, and a packing list that was conveniently re-issued. The invoice says 21 crates, the yard has 20, and that difference is a conversation worth having before the ship sails, not after.

Check 2 — The Batch Number, in Three Places

This is the cheapest check in the whole sequence, and it finds the most expensive problems. The batch number — the lot number that ties the test report to the actual stone — must appear three times, and match three times:

  1. on the test report the buyer approved,
  2. on the packing list for this order,
  3. and on the crate labels themselves.

If the crate label says batch A and the test report says batch B, the stone in the container is not the stone the lab tested — an untested product is about to ship. This is the check that catches "we ran out of batch A, batch B was close enough" before it reaches the buyer's port. Photographing all three side by side gives the buyer the comparison directly, with no translation needed.

Check 3 — Open One Crate and Measure: Size, Thickness, and the Calliper

One crate, from the middle of the stack, not the easiest one on top. Cut the straps, lift the lid, and measure what is inside. The pass line is the tolerance agreed in the order confirmation or spec sheet — not a universal number. Processing method decides what is realistic: CNC-dressed slate is commonly quoted to tighter tolerances (for example ±0.5 mm on thickness), hand-split slate to wider ones (±1 mm or more), and both are workable as long as the packing list states what the product is and the contract holds the supplier to it.

Length and width go on the same record, from the same five tiles. A 500×250 mm tile measuring 498 mm is only a reject if the agreed tolerance says so — which is exactly why the measurement record, not an inspector's instinct, settles the question. What is not negotiable is the size itself as the roofer will experience it: a roof laid to 500×250 coverage has no way to absorb a 247-mm tile, so a spread outside the agreed tolerance is a production conversation, not a rounding error. Measure five tiles, write down all five numbers, and let the buyer see the spread.

Inspector measuring the thickness of a blue-grey roofing slate tile with a digital calliper beside stacked crates
Thickness is checked with a digital calliper on tiles drawn from the middle of the crate, recorded against the tolerance agreed in the order specification.

Check 4 — Colour: The Batch Row Is Where the Roof Is Won or Lost

Now the subjective part — whether the stone matches the approved sample — done under controlled conditions rather than by impression. The working rule is natural light: photograph the tiles in daylight close to what the roof will actually see — overcast, mid-day — not under warehouse sodium lamps that flatten every grey into black.

The real check is not "is this the colour" — it's "is this all the same colour?" The order asked for one shade; the crate should hold one shade. If the top layer matches the sample and the middle of the crate is a slightly different batch, that is a factory that packed "the close enough" and hoped nobody would look. When two tones appear in one crate, pull the layer back, see how many rows are affected, and let the buyer decide: accept the mix, or push back on the whole crate. Either way, the decision happens before the container leaves.

The quietest thing to check at this step is waxed or oiled tiles. A coat of wax over a flawed surface makes the stone look rich and hides nothing that matters; it hides the surface. A tile that shines under the warehouse light but goes dull on the roof is not a better slate, it's a treated one. The colour guide explains what a natural slate surface should honestly look like.

Several natural roofing slate tiles laid out side by side for colour consistency and surface inspection in daylight
Colour and surface checks are done in natural daylight on tiles from the same batch, comparing tone across the row rather than against a single sample alone.

Check 5 — The Ring Test on the Sample Row

The ring test is a screening aid, not a guarantee. Held by the corner and tapped with a steel trowel, a sound tile gives a clean ring; delamination or a hidden crack tends to answer with a dull thud. A clean ring indicates a sound tile, but it does not prove the absence of every internal flaw — and a dull note flags a tile for closer examination, not a verdict on its own. Confirming a suspect tile means looking at it closely, or replacing it, before the container leaves.

Tap ten or fifteen tiles from the middle rows, not from the display crate the factory shows visitors — a weak production run hides in the middle, not at the top. And listen for the difference between tiles: a row of clean rings that breaks into one dull note locates the problem stone. If two of ten answer dully, that points at a production row, and the fixer needs to know before loading, not after arrival. This is the same test the receiving crew will run at the destination door; running it at the factory is what makes a bad row replaceable. The receiving side is spelled out in the inspection checklist — the same test, one layer earlier in the chain.

Check 6 — Damp Packing: The Gate That Gets Skipped

Two different properties get confused at this step, and separating them is the whole check. Water absorption — how much water the stone itself takes up — is a laboratory figure, tested under the applicable product standard (EN 12326 or ASTM C406, depending on the market) and recorded on the test report. It is not something a handheld meter at the loading bay can quantify for the stone body, and no single meter reading should be used as a universal pass–fail threshold for slate.

Surface dampness — water sitting on or between the packed tiles — is a loading-bay condition, and it is what the inspection actually looks for: standing water or dark damp patches on the stacking faces, tiles packed wet after rain or washing, crate timber that is wet, stained or soft, and the condensation risk inside a sealed steel container crossing day–night temperature cycles on the voyage. That is why dry packing matters, and why a packing plan that specifies kraft-lined or ventilated crates takes the condensation question seriously.

The split in evidence is clean: if the question is the stone's absorption, the answer is on the test report; if the question is damp packing, the answer is the photographs and the loading decision. Damp crates or wet tiles mean the load waits — a day of dry air before sealing is the cheapest fix in the whole sequence. The factory QC guide covers the drying and packing gates a serious producer runs before loading day.

Check 7 — The Breakage Count, Done at the Crate, Not at the Port

Here is the part most buyers get wrong the first time: the breakage count belongs at the factory, not at the port. Count the chipped and cracked tiles while they are still inside the crate, and the number that ships is the number that was made — not the number the sea added. A breakage allowance in the 1–3% range is a commonly quoted commercial reference for transit claims, not a fixed industry rule; the figure that actually applies to a shipment is the one written in the contract. The breakage allowance article explains the claim side of that number.

The honest split the count makes possible: a well-packed container commonly arrives at or under 2% breakage from transit alone (again, a reference, not a rule), while chips already in the crates at loading are the factory's count before the sea is involved. On a 1,300 m² order where 1% is about a hundred tiles, the difference between "the sea did it" and "it shipped broken" is the difference between a claim and a quiet correction — and the correction is only available on the factory side of the seal.

Check 8 — The Loading Pass: One Crate at a Time

Now the container itself. A loading pass verifies that the cargo will stay stable for weeks at sea — which is a question of weight distribution and restraint, not of filling every last centimetre of the box. What a competent loading plan demonstrates, crate by crate:

  • Weight distribution. Heavy crates low and spread across the floor, so the load stays balanced and within the container's floor capacity — a top-heavy or lopsided stack is a structural risk before the ship even rolls.
  • Blocking and bracing. Stacks built square, with timber blocking and bracing so that no crate can shift, tip or slide — the restraint is what the sea tests, not the geometry.
  • The door row secured. The last row blocked and braced in place, because the doors are where handling starts and where an unrestrained crate does its damage — twice, once on each side of the Atlantic.

A gap between the crates and the container wall is acceptable wherever the cargo is braced and cannot move; what fails a loading pass is a load that can shift. Photograph every row as it goes in — the photos are the record that the packing plan was actually followed, and the reference for anything that moves in transit. The crate and packing standards article walks the stacking plan; the loading pass is the check that the plan happened.

Wooden crates of roofing slate being loaded into a shipping container with blocking and bracing visible
The loading pass checks weight distribution, blocking and bracing — a load that cannot shift is a load that arrives the way it left.

Check 9 — The Seal: Evidence, Not Risk Transfer

The seal's job is evidence, not law. A numbered bolt seal ties the closed container to the shipping documents: the number goes on the packing list and the buyer's paperwork, and every party along the route — carrier, port, buyer's receiving crew — can check that the door has not been opened since the factory closed it. Photograph the seal number with the container and crate labels in frame; that photo is the reference point for the whole voyage.

What the seal does not do is transfer risk. Risk transfer is decided by the Incoterms in the contract — under FOB and CIF (Incoterms 2020), risk normally passes when the goods are loaded on board the vessel at the port of shipment, not when the seal is fitted at the factory. The incoterm decides who owns the sea leg, and the pre-shipment inspection is the buyer's last look at the stone before that point. Claim windows for transit damage are set by the carrier's terms and the contract — commonly short — so the seal photo, the loading photos and the inspection report are what make a claim possible at all.

Inspector verifying the numbered bolt seal on a shipping container door against the shipping documents
The seal number links the closed container to the shipping documents — an evidence chain for integrity and tracking, while risk transfer follows the contract's Incoterms.

Check 10 — The Paperwork: Three Documents and the Warranty

Last, the paper. Check that the packing list matches the crates, the test report's batch number matches the labels, and the invoice matches the quoted specs — the same numbers as Check 1, now closed out at the end. Then the real question: what happens if the container arrives and something doesn't match? An inspection is only as strong as the warranty behind it. A written line in the contract — for example, "over 2% broken in the container, replaced at the contract price; photos with the ruler and the packing list are the evidence" — is worth more than any single inspection day.

Notice what this sequence never needed: "quality control" in the abstract. QC is not a philosophy; it is a sequence. The factory that runs this sequence on every order is a different business from the factory that runs it on the orders it likes. The sourcing guide tells a buyer what to look for in a supplier; this checklist is what to look at while the container is being sealed.

The Downloadable List (and What Each Line Means)

Here's the whole thing on one page — print it, stick it in a notebook, and tick as you go. The right column is the "why": the number, document or test that makes each line more than a ritual.

CheckWhat you're verifyingThe number / pass line
1. Crate countCrates in the yard = packing listCounted from the rows, photographed per row
2. Batch numberTest report = packing list = crate labelsOne number, three places, three matches
3. Size & thicknessFive tiles, measured with a calliperAgainst the tolerance in the order spec (processing method noted)
4. Colour & batchSame colour across the crate rowNatural-light photos; no two tones in one row
5. Ring testTen to fifteen tiles from the middle rowsScreening aid: a dull thud flags the tile for closer inspection
6. Damp packingDry tiles, dry crates, no standing water, condensation risk consideredAbsorption verified on the test report (EN 12326 / ASTM C406)
7. BreakageBroken tiles counted inside the crate, at the factoryThe sea's share vs the factory's share; allowance per contract
8. LoadingWeight distribution, blocking, bracing, door row securedNo load that can shift; every row photographed
9. SealSeal number photographed + recorded in the paperworkEvidence chain and tracking; risk transfer follows the Incoterms
10. PaperworkPacking list, test report, invoice, photosAll numbers match, or the seal waits

A print-ready PDF version of this checklist — with fields for the order number, inspection date, sample quantities, pass criteria, results, photo references and the inspector's signature — is available for download: Roofing Slate Pre-Shipment Inspection Checklist (PDF).

The line between the arrival inspection and this pre-shipment one is simple: at the factory you can still fix it; at the port you can only claim it. Every hour spent here is an hour not spent negotiating later. And where the buyer cannot attend, that is the honest business case for third-party inspection — the fee is confirmed with the service, and it is small against the cost of a bad container.

Frequently Asked Questions

What is a pre-shipment inspection for roofing slate?

A documented check at the factory before the container is sealed — run by the buyer, by the supplier's QC under a written procedure, or by a third-party inspector. It covers crate count, batch number, size and thickness, colour and surface, soundness, damp packing, breakage, loading, the seal and the shipping documents, catching the problems that can still be fixed at the factory rather than claimed at the port.

Is third-party inspection worth the money?

For any container the buyer cannot be on site for, usually yes. Fees vary by provider and scope and should be confirmed with the inspection service, but for most loads the cost is small relative to the value of the container. The inspector sees the batch match, the damp-packing condition and the loading restraint — three things photographs and samples cannot show — and produces the paper trail (batch number, seal number, photos) that supports any later claim.

What should I check when the slate is loaded into the container?

The loading pass: weight distributed with heavy crates low, stacks blocked and braced so nothing can shift, the door row secured, and no loose crates that can slide. Gaps are acceptable wherever the cargo is braced and cannot move. Then the seal number photographed and recorded, and the documents checked to match. A load that cannot move is a load that arrives the way it left.

How is a pre-shipment inspection different from the arrival check?

At the factory the problems can be fixed — a mismatched batch re-matched, damp crates dried, a bad production row replaced. At the port the same problems can only be claimed. The pre-shipment inspection is the buyer's last look at the slate before the goods pass onto the sea leg under the contract's Incoterms; the arrival check is the count that opens the claim window. Both are needed, on opposite sides of the seal.

Do I need a third-party inspector for every order?

No. A repeat supplier with a proven record, a documented packing plan and a batch the buyer has already seen can often be trusted on a photo review. A first order, a new factory, a short production window or a custom colour is when an inspection clearly pays. A practical rule: inspect the first shipment closely, then let the record earn trust.

What documents should the inspection produce?

An inspection report with photographs: the batch number in three places, the calliper measurements against the agreed tolerance, the damp-packing observations, the loading photos row by row, the seal number, and the matching numbers on the packing list, test report and invoice. That report is the buyer's evidence if the container arrives damaged — and the checklist that keeps the sea's damage and the factory's damage separately counted.

Related Reading

Buy the Slate, Not the Surprise

Every order we ship runs a documented pre-shipment check — batch, damp packing, loading, seal — with the report and the photos going to the buyer before the container leaves. see the roofing slate range · view our test results · ask for the inspection report on your order